Intervals

Prev Top Next More

Intervals dictate the criteria a maintenance strategy uses to generate orders. A maintenance strategy could have one or multiple intervals added to it depending on the kind of maintenance the affected devices require.

maintenance-strategy-diagram

Diagram Showing the Components Used to Generate Orders Through a Maintenance Strategy

If you are creating a time-based interval to generate orders for an asset managed outside of VertiGIS FM Maintenance (for example, a building), add it directly to the Intervals section on the details page for the asset or the object. Maintenance strategies for assets other than devices and components can only have one interval applied, and it must be time-based.

Add Intervals to a Maintenance Strategy for Devices or Components

Once a maintenance strategy has been created, you can add intervals to it. Intervals are added on the Maintenance Strategy details page.

Add Intervals to a Maintenance Strategy

1.Navigate to the version details or device details page for the maintenance strategy to which you want to apply an interval.

2.In the Maintenance Strategies section, double-click the maintenance strategy you want to apply an interval to, or select it and click the View Details (icon-view-details) icon.

3.Expand the intervals section and click the Add (icon-add) icon.

add-interval-

4.From the first Type drop-down menu, select the option that describes the orders that will be generated.

You may not be able to select the desired Interval Type from this drop-down menu because the Type has not been assigned to the Version. You can assign Types to Versions in the Maintenance Type catalog. To assign the Interval Type to the Version, click Administration in the left pane, and then click Master data > Catalog management > Maintenance > Type of order. Double click the Interval Type, select the Version(s) you want to apply it to, and then click Save and Close.

5.From the second Type drop-down menu, select the type of interval you are creating (meter-based, measurement-based, or time-based). Read more about Interval types here.

oIf you select Meter-based, select an operating counter from the Counter drop-down menu. If there are no options to select, you must first add an Operating Counter. Selecting an Operating Counter from the Counter drop-down menu causes a unit of measurement to load next to the Interval text box. The value you enter in the Interval text box is the threshold that based on which the system will generate appointments as you record meter readings.

oIf you select Measurement-based, select a Measure from the Measure drop-down menu, and then select a range from the selected measure's associated threshold table from the Limiting Size Type drop-down menu. You must have already created a Measure and Threshold Table on the device's version details page before creating a measurement-based interval.

oIf you select Time-based, enter a number in the Interval text box, and then select a unit of time from the drop-down menu. Together, these inputs indicate how frequently the maintenance strategy will generate orders.

6.Fill in the rest of the form. Refer to the Interval Form Fields for descriptions of the various fields.

add-interval-1

7.Expand the Default values for the order tab and enter additional interval details, as relevant. You can save the interval without completing any of these fields.

8.Click Save and Close.

The Intervals section now shows the new Interval.

add-interval-2

Intervals Section

Interval Form Fields

Field

Description

Type

The type of measurement associated with the interval. Selectable options include the following:

Check

Inspection

Malfunction

Screening

Service Requirement

Servicing

Technical Inspection Authority

Type

The type of measurement associated with the interval. Additional fields displays based on the selection from this drop-down menu.

Selection

Description

Fields

Meter-based

Generates future action dates based on a threshold value and trends set by recorded meter readings.

Counter

The meter to be used for the Interval. Only operating counters that have been applied to the version can be selected.

Interval

A value that, paired with the unit associated with the counter, forms the threshold that, when exceeded, the system uses to generate future appointments.

Measurement-based

Generates actions based dates based on recorded values that fall outside of a range of pre-defined values. This is similar to meter-based intervals but instead of using a single threshold that readings must stay over or under, a measurement-based interval requires meter reading values to fall within a range of values defined in a threshold table.

Measure

The Measure to be used. Any Measures created for the device's group can be selected.

Limiting Size Type

Inspection Limit

The range within which no inspection or appointment is generated.

Operating Limit ("limit size")

The range within which the device or system can continue to operate.

Plausibility Limit

The range of values that it is possible to register.

Counter

The meter to be used for the Interval. Only operating counters that have been applied to the version can be selected.

Time-based

Schedules action dates to occur on a time-based schedule. You define the amount of time that should elapse between action dates.

 

Refer to Interval Types for more information.

Lead

The amount of time before the scheduled appointment that the measure can take place.

Follow-up Time

The amount of time after the scheduled appointment that the measure can be carried out until without any issue.

Valid From ("Gultig Von")

When the rule is valid from.

Valid Until

When the rule is valid until.

Order Template

A tool that allows you to upload a template that fills out the other fields on this form.

Work Sheet

Instructions for carrying out the order.

Time till first date

The amount of time until the first appointment. If this field is left blank, the system defaults to today's date as the first planned date. What is the difference between this field and the "Lead" field?

Basis for previous target date

A flag that, when set, ensures the orders always occurs at the same interval without any delays.

Last day of the month

A flag that, when set, generates the planned date of an action for the last day of the month. This feature ensures a measure occurs monthly despite the varying number of days in each month.

Create a Maintenance Strategy with a Time-Based Interval for Non-Maintenance Asset

You can add maintenance strategy with a time-based interval to assets managed outside of VertiGIS FM Maintenance (i.e., assets other than devices and components). You cannot create maintenance strategies or use meter- or measurement-based intervals for assets managed outside of VertiGIS FM Maintenance.

To Create a Maintenance Strategy with a Time-Based Interval for a Non-Maintenance Asset

1.Expand the Intervals section on the asset's details page.

2.Click the Add (icon-add) icon.

add-interval-3

3.In the Maintenance Strategy section, enter the maintenance strategy details.

4.In the Interval section, enter the interval details.

Because you can only add a time-based interval when creating an asset for a non-maintenance asset, the Type menu is not available.

5.Click Save and Close.

add-interval-4

Edit an Interval

You can edit an interval by selecting the interval in the Intervals section of the Maintenance Strategy details page and clicking the Edit (icon-edit) icon.

Changes to an interval do not affect overdue appointments.