An existing project is to be processed.
The Planning manager tab is opened in the side area and an existing project can be searched for further processing using the Find project filter option from the list of projects already created or selected from the list below.
1.The following functions for editing a project are available for an existing project via the action menu :
Button |
Description |
---|---|
Open |
Open the project for editing. |
Metadata |
Shows the metadata of the planning project. |
Edit |
Opens the attribute form to edit the project metadata. |
Zoom |
Zoom to the project. |
Pulse |
Briefly highlight the project on the map. |
Delete |
Delete the project. |
Release locks |
Release all locks for this version. Releasing all locks on a version will result in a data loss of all unsaved edits. |
2.Opening the project
The planning project is opened and can now be edited further.
Button |
Description |
---|---|
Zoom |
Zoom to the project. |
Edit |
Opens the attribute form to edit the project metadata. |
Create the report for Bill of Materials |
Create the report for Bill of Materials of the current project. |
Highlight features |
Highlight all project features on the map. |
Construction phases and planning features can be added to the project.
The Networks Simulator automatically locks a project when it is opened by a specific user session. This ensures that only one user can edit a given project at a time, preventing conflicts and maintaining data integrity. To manually release the lock, use the Release Lock option from the action menu.
Releasing the lock will discard any unsaved edits made during the current session.