The scheme connectors are used to connect the line with the inner workings of a plant or installation.
The ConnectionPoint is set in the installation/plant schema at the edge of the plant. They serve as a transition between the plant schema and the incoming/outgoing lines.
See Transition From Line Construction to Plant Construction
PlantConnectionPoint [712] |
|