The different types of detection for the transition area between the line construction and the plant construction have different possibilities. To show these with the interrelationships, a schematic diagram was created. This is intended to illustrate the relationships of the various AssetGroup/AssetTypes. At the same time, it can also be a help on how the data should be maintained.
The principle is identical for all Solutions.
In the water model there is additionally the DeliveryPoint, which was defined as subnetwork controller. This can be used directly as a transition object between line and installation construction. It can still be used in an installation if the installation requires it such as the combination reservoir and staged pumping station(s).