It is assumed that the project setup has been done and the topology has been activated.
Generally, when collecting, the objects automatically snap correctly. If this is not the case, the asset type must be checked for the existing element and the new element to be created. As a rule, the asset type Unknown is set.
Step |
Remark |
---|---|
Collect the required objects 1.Line 2.RegulationDevice/DeliveryPoint 3.Save edits and validates the network |
|
Collecting the regulator 1.Select the regulator (controller) with Modify Controller and Select feature 2.Specify the connection point (Out) 3.Select tier (WAT_DistributionPressureZone) 4.Fill in subnet controller name (unique) 5.Enter subnetwork name 6.Click Apply |
|
Validate and save network |
|
Form subnetwork 1.In the geoprocessing tool Update Subnetwork, select from the toolbox Utility Network Tools 2.In the tier selection select the option WAT_DistributionPressureZone 3.Start process |
|
WATSubnetLine now includes a subnetwork line. |