Introduction

The use of the field Status is a challenging task, because the status can be anything. A lot of information was stored here in the past.

Few higher-level phases in the lifecycle of an object are relevant for the network. These usually start with planning, move on to construction and then to operation. In the past, the decommissioning phase was often neglected and is now also systematically maintained.

The lifecycle theme was split into two attributes because this is central to network formation. Information about switching states, ownership, etc. is mapped in independent fields or via functionalities.

LifeCycle Network

A simplified lifecycle form is used for the network. This is broken down into the four main phases used in all customer implementations for network formation and plan information. The definition for the NET_MainLifeCycleStatus contains the following values:

<coded_value code="0" description="Unknown"/>

<coded_value code="1" description="Planning"/>

<coded_value code="2" description="Construction"/>

<coded_value code="4" description="Service"/>

<coded_value code="8" description="Decommissioned"/>

0 – Unknown
Should not be used, but is listed for completeness.

1 - Planning
Objects that are to be newly built.

2 - Construction
Objects that have been built but not yet handed over to the service.

4 - Service
Objects that are maintained.

8 - Decommissioned
Objects that are disconnected from the network and are no longer used for operations. These items have been depreciated or removed from the fixed asset accounts.

For network creation only elements are used that have the value of Operation. For more information on the subnet definitions, see the corresponding Solutions. For queries, network tracing all other values or other fields and information can be used.

Various planning approaches influence the lifecycle theme. In addition to plant construction, line construction and country-specific standards and recommendations, there is a large amount of terminology. All terms and common models can be assigned to one main lifecycle. The following table shows and assigns the three most important models in Europe.

NET_MainLifeCycleStatus

Phases HOAI

Line construction (SIA 112)

Plant construction
see e.g. DIN SPEC 91295:2014-01

Idea

 

1 Strategic planning (ZNP)

 

Planning

P1: Preliminary assessment

P2: Preliminary planning 

P3: Design planning 

P4: Approval planning

P5: Implementation planning.

P6: Preparation of the award

P7: Participation in the awarding

2 Preliminary studies

3 Project planning

 31 Preliminary project

3 Project planning (construction project)

4 Tender

5 Construction

 51 Implementation project

(A) Concept phase

(B) Definition phase

(C) Design phase

(D) Development phase

Construction

P8: Object supervision - construction supervision and documentation

5 Construction

 52 Execution 

(E) Construction phase

In operation

P9: Object support

6 Management

(F) Operation and maintenance phase

Decommissioning

 

 

(G) Decommissioning phase

Main life cycle

 

The detailed life cycle has been defined in the current Solutions, but does not include rules for updating the main life cycle (field NET_MainLifeCycleStatus).

 

NET_MainLifeCycleStatus

Code

1

2

4

8

 

Planning

Construction

In operation

Decommissioning

DetailLifeCycleStatus

 

 

 

 

Code

Status

 

 

 

 

1

Preliminary study

New

 

 

 

2

Preliminary project

New

 

 

 

4

Main project

New

 

 

 

8

Detailed project

New

 

 

 

16

Modification (planned)

Existing

Existing

Existing

 

32

Außerbetriebsetzung (geplant)

Existing

Existing

Existing

Existing

64

Dismantlement (planned)

Existing

Existing

Existing

Existing

128

Construction (active)

 

New

 

 

256

Construction (completed)

 

New

Existing

 

512

Modification (active)

 

 

Existing

 

1024

In operation

 

 

Existing

 

2048

Reserve

 

 

Existing

 

4096

Temporary /
Temporary development

 

 

Existing

 

8192

Disconnected from the mains

 

 

Existing

Existing

16384

Abandoned

 

 

 

Existing

32768

Dismantlement (active)

 

 

 

Existing

65536

Rückbau (abgeschlossen)

 

 

 

Existing