The different types of detection for the transition area between the line construction and the plant construction have different possibilities. To show these with the interrelationships, a schematic diagram was created. This is intended to illustrate the relationships of the various AssetGroup/AssetTypes. At the same time, it can also be a help on how the data should be maintained.
The principle is identical for all Solutions. Electricity was additionally divided into network levels.
In the electricity model, the network levels were additionally inserted in the AssetGroups and AssetTypes. These already define in themselves which levels may be connected to each other.